Muang Sing GTZ project

Project:
GTZ Rural Development project Head office (GTZ today GIZ)
The houses framework design follows the Luang Nam Ta traditional roof carpentry.
800 Hmong families took part in the production of wooden tiles (3000 m² roofs) in Xieng Kuang Province.
The tiles were made of “mai ko nam deng” (chesnut wood).
Client:
GTZ
Year:
1994
Location:
Muong Sing, Luang Nam Tha Province
Surface:
1500 m²
Our services:
– Architecture design
– Interior design
– Civil, mechanical & electrical engineering
– Project costing
– Contractors bidding documents & contract signing assistance
– Construction, administration & project management